2022-01-07
Villa basement waterproof, moisture-proof construction skills and details
2022-01-07

Villa basement will face moisture-proof construction, and the construction skills and details, for the owner is not so clear, but you have to understand to know whether their living environment is healthy and comfortable.


First, traditional waterproof layer construction skills and details


1, waterproof layer thickness should be enough, if found leakage must be timely remedy, not delay, muddle through the end of the infinite;


2, in the purchase of waterproof materials to choose high visibility, good reputation, high degree of anti-counterfeiting, and international quality system certification of the brand products, this can pay more attention to their own peacetime, more Internet to know some information, do not cogly cheap;


3, in the decoration of the waterproof parts to be comprehensive, the basement ground and all the walls should be waterproof, moisture-proof treatment;


4, in the process of decoration construction should be careful: the joints of the wall and the ground, Yin and Yang Angle, water pipes, floor drains and sanitary ware around the laying of cold and hot pipe trench is the key waterproof part;


5, after the completion of the renovation of the closed water experiment: after the completion of construction, seal the door and water outlet, indoor water storage for 24 hours, check whether there is leakage.



Two, TQ-EPT electroosmosis anti-seepage dehumidification system construction skills and details


If do TQ-EPT electric seepage fight seepage dehumidification system can need not do traditional waterproof layer.

1. Why should the positive pole line go at right angles?


From the final effect, no matter the shape of the line layout is a right Angle or 45° corner, it will not affect the completion effect.


And the reason we chose a right Angle turn:


(1) From the work efficiency, corner turning is rigid line, right Angle turning is flexible line.


The poor flexibility of rigid line is not flexible enough in the process of laying, which increases the difficulty of laying process and leads to low construction efficiency.


Flexible line is very easy to use, can greatly improve the construction process, reduce the difficulty of layout.


② From the quality of the material, the rigid line is easy to break, peel off, crack; And flexible line can completely avoid such problems, low consumption, more durable.

 


2. How deep is the groove?


We will install anodes in the room, and the decorated or painted structures shall have grooves for wiring, with grooves of 2cm in depth and width (bare structures can be wired directly) and finally sealed with special cement.


3, how deep is the negative rod drilling?


The hole was drilled from the inside of the structure to the soil on the outside of the structure with a depth of 1-2m and a depth of 0.3-1.5m in the soil. The copper metal negative pole was inserted and sealed with special cement.


4. What are the materials of the positive and negative poles?


The positive electrode material and the strong electron are made of polymer conductive PE or titanium foil composite material with patented technology, and the negative electrode is made of copper clad steel rod or carbon rod.



Telephone counseling

+86-731-85716365

WeChat consulting

WeChat consulting

Online consulting

TOP