Walthamstow Central Tube Tunnel, London, UK
Year: 2005
Location: London
Project: underground passage - electroosmotic pulse anti-seepage dehumidification system installation
Guest: London Underground
Background: Water leakage occurred in the corridor between the bus stop and the MTR station from the side wall to the bottom plate, affecting traffic. After adopting electro-osmotic pulse anti-osmotic dehumidification system, the problem of water seepage was completely solved. After 1 month, the relative humidity was reduced from 100% to 90%. After several months of detailed testing, it meets the European application standards and is approved by CE.