2021-09-13
Should the first floor be waterproof or moisture-proof?
2021-09-13

Open a window at ordinary times ventilated, how to feel the home or a bit damp?

I've lived here for years, and the wood floors haven't been soaked how can they blister?

Do you know whether the first floor is waterproof or moisture-proof?



Generally speaking, the lower the floor, the heavier the moisture, but also because the floor is low, the ventilation effect is poor, if there is water leakage, compared with other floors, the first floor is more difficult to dry water, in the long run, will cause the decorative surface discoloration, mildew and other phenomena.


The first floor besides should do hutch defend these besides the processing that prevent clear water, do moistureproof processing even. For the first floor, especially for the house without underground overhead layer, there is a lot of moisture below the ground because of rain erosion and groundwater, if the ground is not waterproof and moisture-proof treatment, moisture will emerge to erode the ground floor, carpet and other materials.



At the same time, the whole building wall body as a whole, in which water vapour will "escaping", due to the moisture heavier sinks, and therefore tend to pile up on the first floor, will increase the "load" on the first floor wall, moreover, because of the first floor, low-lying, generally less sunshine, poor ventilation, residual moisture evaporates slow, in the building when decorate wall is difficult to dry, it is also one of the causes of moisture is heavy on the ground floor.


Accordingly, be aimed at the special case of the first floor, we defend besides hutch outside need to do waterproof, all need to undertake moistureproof processing to the ground of the first floor, metope. Traditional moisture-proof treatment can only temporarily prevent the structure from being affected by moisture. If you want to be completely moisture-proof, you have to use a dehumidification system. Tq-ept electro-osmotic pulse anti-seepage dehumidification system can completely solve the damp problem on the first floor.


After the installation of TQ-EPT, the moisture on the surface of the structure will be eliminated in 1-3 months and gradually become dry. The water on the ground will fade in 1-3 months and gradually become dry. The mold on the surface of the structure will gradually become dry and powdery in 3-5 months. And our products for ten years to replace not repair, 30 years shelf life, then only need to replace the system host can, really do once and for all.



Telephone counseling

+86-731-85716365

WeChat consulting

WeChat consulting

Online consulting

TOP